当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:主梁采用T型截面,且为五片T梁,施工方法采用先简支后连续施工方法。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
主梁采用T型截面,且为五片T梁,施工方法采用先简支后连续施工方法。
问题补充:

  • 匿名
2013-05-23 12:21:38
The main beam t cross section, and five t-beam construction method of Simple and Continuous Construction.
  • 匿名
2013-05-23 12:23:18
Main frame with T-cross-section, and is 5 piece T Leung, methods of construction used in short support after first construction methods.
  • 匿名
2013-05-23 12:24:58
The king post uses the T section, also is five piece of T Liang, after the job practice uses first the simple support the continuously job practice.
  • 匿名
2013-05-23 12:26:38
Used t-section main beam, and five t-beam construction method using construction method of simply supported-continuous.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭