求翻译:本篇论文通过对目前建设工程中工程延误事件的分析,对工期索赔中存在的索赔不及时、索赔程序不规范、索赔结果不乐观等问题,给出了工期索赔中的法律依据、计算方法及处理技巧。提出具体的处理措施,并结合实际情况提出了工期索赔的策略,有助于提高建筑工程工作人员工期索赔水平。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本篇论文通过对目前建设工程中工程延误事件的分析,对工期索赔中存在的索赔不及时、索赔程序不规范、索赔结果不乐观等问题,给出了工期索赔中的法律依据、计算方法及处理技巧。提出具体的处理措施,并结合实际情况提出了工期索赔的策略,有助于提高建筑工程工作人员工期索赔水平。
问题补充:

  • 匿名
2013-05-23 12:21:38
This thesis through the analysis of the current construction project slippage event, the claim period claim is not timely, the claim procedures are not standardized and not optimistic about the results of claims and other issues, given the legal basis for the duration of claims, the calculation meth
  • 匿名
2013-05-23 12:23:18
This paper on the current construction projects through the construction delays, the analysis of the results in the claim there is a claim that the claim is not timely, the claim is not normative, and results are not promising, and the period was the legal basis in the claim, and methods of calculat
  • 匿名
2013-05-23 12:24:58
This paper through to at present construction project in the project delay event analysis, the claim which exists to the time limit for a project claim in not prompt, the claim procedure not standard, the claim result not optimistic and so on the questions, has given in the time limit for a project
  • 匿名
2013-05-23 12:26:38
This paper through the analysis of the current slippage in the construction works, claims, claims in a timely manner in the claim procedure issues such as irregular, claims the result is not optimistic, given the legal basis of the claim, and the calculation methods and techniques. Treatment measure