当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The time are estimates based on an average length driving route,good weather conditions,light traffic ad a well-prepared driver.Skills tests must include all the segments listed below.A test may take more time than shown in ths table,but should not take significantly less time是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The time are estimates based on an average length driving route,good weather conditions,light traffic ad a well-prepared driver.Skills tests must include all the segments listed below.A test may take more time than shown in ths table,but should not take significantly less time
问题补充:

  • 匿名
2013-05-23 12:21:38
是根据平均长度的行驶路线,良好的天气条件,道路交通广告,准备充足的driver.skills测试必须包括所有上市below.a测试可能需要更多的时间比部份表所示段时间的估计,但不应该采取显着更少的时间
  • 匿名
2013-05-23 12:23:18
估计的时间是根据平均长度为驾驶路线,良好的天气条件、轻交通特一个充分准备驱动程序”技能测试必须包括下面列出的所有部分。一个测试可能需要更多时间、更少的ths表所示,但不应采取时间更少
  • 匿名
2013-05-23 12:24:58
时间是根据平均长度的估计驾驶路线,好天气情况,轻的交通广告一个准备充分的司机。技能测试必须包括如下所示的所有段。测试在ths桌里比显示也许花费时间,但不应该极大花费时间
  • 匿名
2013-05-23 12:26:38
时间是基于行车路线,良好的天气条件下,光交通广告精心准备的驱动程序的平均长度的估计数。技能测试必须包括下面列出的所有部分。测试可能需要更多部份表中所示的时间,但不是应显著较少的时间
  • 匿名
2013-05-23 12:28:18
时间是根据一条平均长度操纵的路线,好的天气状况的估计,一好地准备的 driver.Skills 测试的轻的交通广告必须包括被列出的所有段 below.A 测试可能花更多时间比显示在 ths 桌子,但是明显不应花更少时间
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭