当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The time are estimates based on an average length driving route,good weather conditions,light traffic ad a wel-prepares driver.Skills tests must include all the segments listed below.A test may take more time than showm in ths table,but should not take significantly less time是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The time are estimates based on an average length driving route,good weather conditions,light traffic ad a wel-prepares driver.Skills tests must include all the segments listed below.A test may take more time than showm in ths table,but should not take significantly less time
问题补充:

  • 匿名
2013-05-23 12:21:38
时间的估计是基于平均行驶长度路线,良好的天气条件,道路交通广告1 WEL准备driver.skills测试必须包括所有上市可能需要below.a测试部份表比showm时间段,但不应该采取显着更少的时间
  • 匿名
2013-05-23 12:23:18
估计的时间是根据平均长度为驾驶路线,良好的天气条件、轻交通的wel的编写驱动程序.技能测试必须包括所有各阶层的下面列出。测试可能需要更多时间、更少的showmths表,但不应采取时间显著缩短
  • 匿名
2013-05-23 12:24:58
时间是根据平均长度的估计驾驶路线,好天气情况,轻的交通广告a wel准备司机。技能测试必须包括如下所示的所有段。测试在ths桌里比showm也许花费时间,但不应该极大花费时间
  • 匿名
2013-05-23 12:26:38
时间是基于行车路线,良好的天气条件平均长度的估计,光交通广告韦尔-准备驱动程序。技能测试必须包括下面列出的所有部分。测试可能需要更多的时间,比 showm 在部份表中,但不是应显著较少的时间
  • 匿名
2013-05-23 12:28:18
时间是根据一条平均长度操纵的路线,好的天气状况的估计,一 wel 准备的 driver.Skills 测试的轻的交通广告必须包括被列出的所有段 below.A 测试可能花更多时间比 ths 桌子中的 showm,但是明显不应花更少时间
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭