当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:2.8 用万用表及兆欧表在防爆配电箱处安步骤3再次检测,(同时在接线端子处检查的电气性能)。确认无误后,拧紧防爆配电箱的所有螺母。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
2.8 用万用表及兆欧表在防爆配电箱处安步骤3再次检测,(同时在接线端子处检查的电气性能)。确认无误后,拧紧防爆配电箱的所有螺母。
问题补充:

  • 匿名
2013-05-23 12:21:38
2.8 with a multimeter and megger in explosion-proof distribution box at the security steps detected again (at the terminal to check the electrical properties). Verified, tighten all nuts tight explosion-proof distribution box.
  • 匿名
2013-05-23 12:23:18
A table with 10,000 2.8 and the Power Distribution Box in an explosion at the step 3 again (while at the terminals of electrical performance. After you confirm that this is an explosion, and tighten all nuts in power distribution box.
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
2.8 with a multimeter and megohmmeter step 3 test again at the explosion-proof power distribution boxes, (while checking electrical performance at the terminals). After verification, tighten all nuts explosion-proof power distribution boxes.
  • 匿名
2013-05-23 12:28:18
2.8 uses the avonmeter and the megameter 3 examines once more in the explosion-proof distributing box place peaceful step, (at the same time in binding clamp place inspection electrical specification).After confirmed unmistakable, screws tight the explosion-proof distributing box all nuts.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭