求翻译:The well shall be fitted with a flow meter and gate valve. The gate valves shall be adjusted to control the drawdown within the well to suit requirements .After installation, the submersible pump shall be tested to ensure that the pump and switches are functioning. The On &Off switches will be subject to be reviewed d是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The well shall be fitted with a flow meter and gate valve. The gate valves shall be adjusted to control the drawdown within the well to suit requirements .After installation, the submersible pump shall be tested to ensure that the pump and switches are functioning. The On &Off switches will be subject to be reviewed d
问题补充:

  • 匿名
2013-05-23 12:21:38
应装有流量计和闸阀井。闸阀应调整控制在良好的缩编,以满足要求。安装后,应进行测试,以确保潜水泵,泵和开关运作。开关泵测试期间将受到审查和工程师提供。
  • 匿名
2013-05-23 12:23:18
福均须安装有一个流量计和阀。 有关水掣的缩编工作应进行调节,以控制在适合要求.在安装之后,潜水电泵进行测试,确保了泵和交换机都在正常运行。 关闭的问题(&n)将会受到审查交换机在油泵检测及将会提供之工程师。
  • 匿名
2013-05-23 12:24:58
将好地拿着流量的米和门阀门被安装。门阀门将调整被适应控制 drawdown 中好地适合要求 .After 安装,可淹没的水泵将被测试确保水泵和开关起作用。 The On &Off switches will be subject to be reviewed during the pump test and to be provided by the Engineer.
  • 匿名
2013-05-23 12:26:38
井须装有一个流量计和闸阀。须调整闸阀,以控制缩编内井以满足需求。安装完成后,潜油电泵须测试,确保泵和交换机的功能。对科技关闭开关将提交给水泵测试期间,由工程师提供审查。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 