当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本文在介绍了地铁牵引供电系统的基础上,首先根据直流牵引变电所主接线以及二十四相整流机组外特性,分析直流供电系统的结构和功能,给出直流牵引网短路故障电流的计算方法。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本文在介绍了地铁牵引供电系统的基础上,首先根据直流牵引变电所主接线以及二十四相整流机组外特性,分析直流供电系统的结构和功能,给出直流牵引网短路故障电流的计算方法。
问题补充:

  • 匿名
2013-05-23 12:21:38
On the basis of a subway traction power supply system, the first external characteristics of the main terminal of the DC traction substation, as well as the 24-phase rectifier unit, analyze the structure and function of the DC power supply system, given the short circuit fault current of the DC trac
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
This article in introduced in the subway hauling power supply system foundation, first tows the transformer substation host wiring as well as 20 four-phase rectifier unit external characteristic according to the cocurrent, the analysis cocurrent power supply system structure and the function, gives
  • 匿名
2013-05-23 12:26:38
Metro traction power supply system in this article on the basis of, first under DC traction substations outside the main terminal and 24-phase rectifier unit characteristics, structure and function analysis of DC power supply system, for DC traction power network short-circuit fault current calculat
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭