求翻译:The Contractor shall, at his own expense, make good to the reasonable satisfaction of the Project Manager, authorities, owners and tenants concerned, all land, property, roads, tracks, bridges, drains, fences, walls, hedges, gates and the like which are damaged or disturbed during the execution of the Works and shall r是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Contractor shall, at his own expense, make good to the reasonable satisfaction of the Project Manager, authorities, owners and tenants concerned, all land, property, roads, tracks, bridges, drains, fences, walls, hedges, gates and the like which are damaged or disturbed during the execution of the Works and shall r
问题补充:

  • 匿名
2013-05-23 12:21:38
承包商应自费,做好合理满意的项目经理,部门,业主和租户涉及所有的土地,物业,道路,轨道,桥梁,排水沟,围栏,墙壁,篱笆,门和工程执行期间被损坏或干扰,并应勃起后删除所有剩余的建筑材料。暂行规定应当由承包商,以防止在工程的执行,直到永久修复围栏,围墙,篱笆,门和完成像偏离或损坏,牲畜。承包商应举行牲畜因未能遵守上述规定的任何损害负责。
  • 匿名
2013-05-23 12:23:18
承包者应,以牺牲自己的利益为代价,做好合理的满意的项目经理、管理机构、业主和租户,所有土地、财产、道路、轨道、桥梁、渠、围栏、围墙、绿篱、门等受损的执行期间或破坏的工程和施工材料后应拆下所有剩余竖立。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
承建商,须自费,作出好项目经理的合理的满意程度,当局、 业主和租客有关,所有土地、 财产、 道路、 轨道、 桥梁、 排水渠、 围栏、 墙、 树篱、 盖茨和像受损坏或工程的执行过程中的不安和须删除安装后所有剩余的建筑材料。暂行规定须由承办商防止偏离的或损害牲畜的工程和之前的围栏、 墙、 树篱,盖茨的永久修复工程的执行过程中,像完成。承建商不得举行负责任何损害牲畜因未能符合上述要求。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 