当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:对铁路工程建设提出了更高的要求,同时也给铁路工程的设计,施工带来了更高的挑战是什么意思?

待解决 悬赏分:1 - 离问题结束还有
对铁路工程建设提出了更高的要求,同时也给铁路工程的设计,施工带来了更高的挑战
问题补充:

  • 匿名
2013-05-23 12:21:38
Railway construction projects put forward higher requirements, but also a greater challenge to the railway engineering design, construction
  • 匿名
2013-05-23 12:23:18
The railway construction of the project have put greater demands, but also to the railways of the engineering design and construction have resulted in more high-challenge
  • 匿名
2013-05-23 12:24:58
Proposed to the railroad engineering construction a higher request, simultaneously also gave the railroad project the design, the construction has brought a higher challenge
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭