当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:1在各种工程建设时,都需要经过勘测、设计、施工这三个阶段。在施工阶段所进行的测量工作,称为施工测量,又称测设或放样。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
1在各种工程建设时,都需要经过勘测、设计、施工这三个阶段。在施工阶段所进行的测量工作,称为施工测量,又称测设或放样。
问题补充:

  • 匿名
2013-05-23 12:21:38
1 in a variety of construction projects, need to go through the investigation, design, construction, these three stages. The survey work carried out in the construction phase, known as Construction Surveying, also known as the measurement set or loft.
  • 匿名
2013-05-23 12:23:18
1 in a variety of construction projects, you will need an investigation, design, and construction of the phase 3. During the construction phase of the construction measure work, known as measure, also known as test or the like.
  • 匿名
2013-05-23 12:24:58
1 when each kind of engineering construction, all needs after the survey, the design, to construct these three stages.Surveying work carries on which in the construction stage, is called the construction survey, also the name surveys or the lofting.
  • 匿名
2013-05-23 12:26:38
1 at the time of construction, are subject to the investigation, design, construction of the three phases. Survey carried out during the construction phase, called the construction survey, also known as the designation of measuring loft.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭