当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Hybrid GAX-PCS, have the same essential elements of a single effect water–ammonia cooling absorption cycle. The rectifier is placed at the top of the generator, to make an integrated generator–rectifier(GE–RE) column. The GAX section of the generator is placed in the top of the absorber in order to integrate the 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Hybrid GAX-PCS, have the same essential elements of a single effect water–ammonia cooling absorption cycle. The rectifier is placed at the top of the generator, to make an integrated generator–rectifier(GE–RE) column. The GAX section of the generator is placed in the top of the absorber in order to integrate the
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
gax,混合的pc,都有相同的基本元素的单一影响水的氨冷却吸收周期。 整流器置于其顶部的发生器,发生器,使综合-整流器(ge-re)列中。 gax节的发电机的顶部放置在减震器,以便使减震器-gax(abgax)列中的图如图所示。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
混合 GAX PC,有相同的基本元素的吸收循环冷却的单个效果 water–ammonia。整流发电机,使集成的 generator–rectifier(GE–RE) 列的顶部放置。GAX 节发电机的放置在减振器顶部以将集成减振器 GAX (ABGAX) 列中,如图 2.Both,GE–RE 中所示,AB GAX 列分隔高 erenergy 集成,取
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭