当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:6.管系部提出由于现使用中的坞门橡胶密封条多处脱落,坞门主管也反映液位遥测淤泥封堵失效至无法读数,温馨提示:船坞部按检修计划定期检修并报告大家,并把这些问题反馈在80米坞门上改进。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
6.管系部提出由于现使用中的坞门橡胶密封条多处脱落,坞门主管也反映液位遥测淤泥封堵失效至无法读数,温馨提示:船坞部按检修计划定期检修并报告大家,并把这些问题反馈在80米坞门上改进。
问题补充:

  • 匿名
2013-05-23 12:21:38
6. Tube Department of the Ministry in charge of the dock door to reflect the level telemetry mud plugging failure to not reading the Tips: dock Ministry of regular maintenance of the maintenance plan and report all now use the dock door rubber seal multiple off feedback and improvement in the 80 met
  • 匿名
2013-05-23 12:23:18
6.The Department as it is now in use by the docking door rubber seals off the docking door supervisor also reflect fluid mud telemetry readings could not be blocked, and failure to warm tips: dock at regular maintenance and repair program, and to report all the feedback on the docking door on 80 met
  • 匿名
2013-05-23 12:24:58
5. An Huanbu formulates the safety control plan and completes the risk assessment in the scheduled time, mid-June before completes the location police to show, the project production symbol.
  • 匿名
2013-05-23 12:26:38
6. pipe part is now in use at the dock door rubber seal of fall off, Dock Gate charge also reflects the silt blocking liquid level telemetry failure to not reading, note: dockyard according to the maintenance schedule maintenance on a regular basis and report everybody, and feedback in the 80 m impr
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待... 正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭