求翻译:包括施工方案及工作原理,钻孔桩施工主要设备,护筒埋设,钻机就位调平,检查验收开孔,泥浆循环系统设置和冲洗液配置,终孔检测,清孔,钢筋笼制作与安装,水下混凝土浇注。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
包括施工方案及工作原理,钻孔桩施工主要设备,护筒埋设,钻机就位调平,检查验收开孔,泥浆循环系统设置和冲洗液配置,终孔检测,清孔,钢筋笼制作与安装,水下混凝土浇注。
问题补充:

  • 匿名
2013-05-23 12:21:38
Construction program and working principle of bored pile construction equipment, Casing drilling rig in place leveling, inspection and acceptance hole mud circulation system settings and flushing the fluid configuration, the final hole detection, hole cleaning, manufacture and installation of the re
  • 匿名
2013-05-23 12:23:18
Include the construction project and work the principle, drill a hole an equipments with main construction, protect the tube to lay, drill the machine to take seat to adjust even, check to check before acceptance to open the bore, the mud circulatory system constitution with flush the liquid to inst
  • 匿名
2013-05-23 12:24:58
Including the construction plan and the principle of work, the drill hole pile construction main equipment, protects the tube embedment, the drilling machine takes place the leveling, the inspection approves start the hole, the mud system establishment and the rinse solution disposition, the end hol
  • 匿名
2013-05-23 12:26:38
Including construction plan and how it works, main equipment of drilling pile construction, pipe laying, drilling rigs in place leveling, open for inspection, acceptance, slurry circulation system configuration sets and washing liquid, final hole detection, clearance holes, making and installation o
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 