求翻译:6、 架空线路引自CPF3#变电站,该变电站内是否设高压出线柜,是否有出口占用费、定值费?由谁负责安装?是什么意思?

待解决 悬赏分:1 - 离问题结束还有
6、 架空线路引自CPF3#变电站,该变电站内是否设高压出线柜,是否有出口占用费、定值费?由谁负责安装?
问题补充:

  • 匿名
2013-05-23 12:21:38
Overhead lines cited since cpf3 # substation, the substation is located high-pressure outlet cabinet, export occupation fee, valuation fee? Who is responsible for the installation?
  • 匿名
2013-05-23 12:23:18
Overhead line 6, * 3# from CPF substation, the substation is located in the Cabinet under pressure, whether or not there is an exit, there will be occupation fee charges? Who is responsible for the installation?
  • 匿名
2013-05-23 12:24:58
6th, Air line guide from CPF3# transformer substation, in this transformer substation whether supposes the high-pressured going beyond a line cabinet, whether has the exportation to take the expense, the definite value expense? Is responsible by who to install?
  • 匿名
2013-05-23 12:26:38
6, overhead line from the CPF3# substation, the substation is located within high-voltage wire, whether exports occupancy costs, setting fees? Who is responsible for the installation?
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 