当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:集电大厦机房电源柜在机房城建初期由于房屋及物业各方面都没完善,导致机房发生漏水,后物业和我方采取措施将漏水修复,此次故障发生,经艾默生公司查看,原因为之前漏水柜导致电源性能下降,在推上控开后因设备短路出现故障,最终导致用户业务中断。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
集电大厦机房电源柜在机房城建初期由于房屋及物业各方面都没完善,导致机房发生漏水,后物业和我方采取措施将漏水修复,此次故障发生,经艾默生公司查看,原因为之前漏水柜导致电源性能下降,在推上控开后因设备短路出现故障,最终导致用户业务中断。
问题补充:

  • 匿名
2013-05-23 12:21:38
Collector Building, room supply cabinets urban construction early in the engine room did not improve in all aspects of housing and property, resulting in the engine room leaks, after the property and we take measures to repair the leaking, the failure by Emerson's view, the reasons for power perform
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
Collection electricity building engine room power source cabinet in engine room urban construction initial period because the house and the property various aspects all have not consummated, causes the engine room to have the water leakage, the latter property and we take the measure to repair the w
  • 匿名
2013-05-23 12:26:38
Collector power supply Cabinet in the early construction of computer room of building room due to housing and property not perfect in every way, lead to engine room leakage at the property after leaking and we take steps to fix this fault occurs, view through Emerson, due to leaking water tank befor
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭