|
关注:1
2013-05-23 12:21
求翻译:所开工备件、安装备件及专用工具应分别单独装木箱,且有防水措施。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
所开工备件、安装备件及专用工具应分别单独装木箱,且有防水措施。
问题补充: |
|
2013-05-23 12:21:38
Started spare parts, installation of spare parts and special tools should be separately packed in wooden cases, and waterproofing measures.
|
|
2013-05-23 12:23:18
Spare parts, installation work by the spare parts and special tools should be individually boxed wooden box, and a water-tight.
|
|
2013-05-23 12:24:58
Begins the spare parts, installs the spare parts and the special-purpose tool should distinguish alone to install the wooden crate, also has the waterproof measure.
|
|
2013-05-23 12:26:38
Started, installation of spare parts spare parts and special tools should be installed separately of wood, and waterproofing measure.
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区