求翻译:此外,当工期优化过程中出现多条关键线路时,必须将各条关键线路的总持续时间压缩相同数值,否则不能有效地缩短工期。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
此外,当工期优化过程中出现多条关键线路时,必须将各条关键线路的总持续时间压缩相同数值,否则不能有效地缩短工期。
问题补充:

  • 匿名
2013-05-23 12:21:38
In addition, when Time Optimization of the process a number of key lines, must be the critical path of the total duration of compression the same value, or can not effectively shorten the construction period.
  • 匿名
2013-05-23 12:23:18
In addition, when scheduling optimization process appears in many of the key line, it must be the various key line of the same total duration Compression value, otherwise it's not effectively reduce the project duration.
  • 匿名
2013-05-23 12:24:58
In addition, when in the time limit for a project optimization process appears the multi-strip essential line, must each essential line total duration compression same value, otherwise cannot reduce the time limit for a project effectively.
  • 匿名
2013-05-23 12:26:38
In addition, when the duration when critical lines that appear in the optimization process, must be the key lines of the total duration of the compression of the same value, cannot be effective in shortening the duration.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 