求翻译:4. 防潮层设在-0.060处,做法为20mm厚1:2水泥砂浆加5%防水剂,遇钢筋混凝土地梁时,则取消防潮层。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
4. 防潮层设在-0.060处,做法为20mm厚1:2水泥砂浆加5%防水剂,遇钢筋混凝土地梁时,则取消防潮层。
问题补充:

  • 匿名
2013-05-23 12:21:38
Moisture barrier located at -0.060, the practice of 20mm thick 1:2 cement mortar with 5% waterproofing agent, the case of reinforced concrete ground beam is canceled vapor barrier.
  • 匿名
2013-05-23 12:23:18
4) Moisture Level is set at 0.060 - the practice of 20 mm thick 1:2 cement mortar watershield plus 5 per cent, in reinforced concrete beams, which is to cancel moisture level.
  • 匿名
2013-05-23 12:24:58
4. The dampproof course is located in - 0.060, the procedure is the 20mm thick 1:2 cement mortar adds 5% water-repellent, when meets steel bar coagulation land Liang, then cancels the dampproof course.
  • 匿名
2013-05-23 12:26:38
4. the vapor barrier is set in-0.060, practice for 20mm 1:2 cement mortar and cent waterproofing agent, when beam of reinforced concrete, damp proof course is cancelled.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 