当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:采集了轧机各关键部位的振动数据(A、B支承辊上侧牌坊,调整机构下侧牌坊,轧机门前上侧,H、E支承辊下侧牌坊)是什么意思?

待解决 悬赏分:1 - 离问题结束还有
采集了轧机各关键部位的振动数据(A、B支承辊上侧牌坊,调整机构下侧牌坊,轧机门前上侧,H、E支承辊下侧牌坊)
问题补充:

  • 匿名
2013-05-23 12:21:38
Collected the vibration data of the key parts of the mill (a, b bearing roller on the side of the arch, the adjusting mechanism on the under side of the arch, in front of the mill side, h, e backup roll under side of the arch)
  • 匿名
2013-05-23 12:23:18
Capture the key points the mills of the vibration data (A B Support roller, side ruins on the opposite side, adjust the torii gate, mills on H , E side, roll down the side support Paul)
  • 匿名
2013-05-23 12:24:58
Gathered the rolling mill various essential spot vibration data (A, on the B support roll side memorial arch, adjusting mechanism breast memorial arch, in front of rolling mill gate on has leaned, H, E support roll breast memorial arch)
  • 匿名
2013-05-23 12:26:38
Collecting vibration data of the key parts of the mill (a, b, back-up roll side Memorial on, adjust the lower body side Memorial, mill on the front side, side under h, e back-up roll Memorial)
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭