当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Because the boiler turbine system is a very complex process which is a multivariable, nonlinear, slowly time-varying plant with large settling time and a lot of uncertain disturbances, the boiler-turbine coordinated control problem has been studied for a long period, but it remains unsolved by using conventional contro是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Because the boiler turbine system is a very complex process which is a multivariable, nonlinear, slowly time-varying plant with large settling time and a lot of uncertain disturbances, the boiler-turbine coordinated control problem has been studied for a long period, but it remains unsolved by using conventional contro
问题补充:

  • 匿名
2013-05-23 12:21:38
因为锅炉涡轮机系统是一个非常复杂的过程,是一个多变量,非线性,慢时变大稳定时间和很多不确定的干扰植物,锅炉 - 汽轮机的协调控制问题已经研究很长一段时间,但它仍然没有解决使用传统的控制技术。
  • 匿名
2013-05-23 12:23:18
由于该锅炉风机系统是一个非常复杂的过程,这是一个多变量、非线性、慢慢地时间的不同植物的大稳定时间和一个很大的不确定干扰,该锅炉的风机内作业协调一致控制问题已被研究了很长时间,但它仍然是没有解决的使用常规控制技术。
  • 匿名
2013-05-23 12:24:58
由于锅炉涡轮系统是一个多变量,非线性,时间慢慢地变化的植物以大结算时间和很多不定的干扰的一个非常复杂过程,锅炉涡轮被协调的控制问题长期以来被学习了,但它依然是未解决通过使用常规控制技术。
  • 匿名
2013-05-23 12:26:38
由于锅炉涡轮系统是一个非常复杂的过程,是一种多变量、 非线性、 慢慢变大沉降时间和很多不确定的扰动的植物,锅炉汽轮机协调控制问题已被研究了长的时期内,但附庸通过使用传统的控制技术。
  • 匿名
2013-05-23 12:28:18
因为锅炉涡轮系统是是有大习惯于时间的一种多可变,非线性,缓慢时间不同的植物的一个很复杂过程和很多不确定的骚动,锅炉涡轮协调的控制问题为一个长句号被研究了,但是它仍然是未解决的所作使用传统的控制技术。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭