当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:根据我公司35000T散货轮的发电机图纸及说明书,一系列的实物观测,技术人员的帮助和查阅相关的技术规范之后。本文通过对原动机的调试、可能出现的故障及故障原因进行了分析,还需要尽量分析完整所出现的各方面的原因,并且还需要逐个了解哪个部位出现的问题。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
根据我公司35000T散货轮的发电机图纸及说明书,一系列的实物观测,技术人员的帮助和查阅相关的技术规范之后。本文通过对原动机的调试、可能出现的故障及故障原因进行了分析,还需要尽量分析完整所出现的各方面的原因,并且还需要逐个了解哪个部位出现的问题。
问题补充:

  • 匿名
2013-05-23 12:21:38
35000t bulk freighter generating drawings and specifications, a series of physical observations, and technical personnel to help and consult the relevant technical specifications. The prime mover debugging may malfunction and cause of the malfunction analysis, but also need to try to analyze the rea
  • 匿名
2013-05-23 12:23:18
According to my company's 35,000 T vessel thermal generators, drawings and instructions for a series of physical observation, technical assistance and access to the relevant specifications. This article by the prime mover to debug, the problem may be the cause of the problem and to the analysis, but
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
35000T bulk carrier under my company's generator drawings and instructions, a series of physical observations, after the technician's help and consult the related technical specifications. Through debugging of the prime mover in this article, possible failure and failure analysis, also need to analy
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭