当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:As to SM,arrange the temporary line from the drain nozzle of each pump delivery to each storage tank.then introduce WM from the drain nozzle provided on the downstream of the flow meter by using a hose.transfer the flushing water into the storage tank and drain it from the storage tank bottom.keep the line filled with 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
As to SM,arrange the temporary line from the drain nozzle of each pump delivery to each storage tank.then introduce WM from the drain nozzle provided on the downstream of the flow meter by using a hose.transfer the flushing water into the storage tank and drain it from the storage tank bottom.keep the line filled with
问题补充:

  • 匿名
2013-05-23 12:21:38
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭