当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:4.1 蒸发式冷凝器安装场地要能保证空气流通,四周距遮挡物应保持1.5M以上空间。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
4.1 蒸发式冷凝器安装场地要能保证空气流通,四周距遮挡物应保持1.5M以上空间。
问题补充:

  • 匿名
2013-05-23 12:21:38
4.1 Evaporative Condenser installation site to be able to ensure air circulation, surrounded by shielding material should be kept away from the space above 1.5M.
  • 匿名
2013-05-23 12:23:18
4.1 * evaporative condenser installation sites should be able to ensure good air circulation, 4 week block property should be kept away from more than 1.5 M space.
  • 匿名
2013-05-23 12:24:58
4.1 The evaporative condenser installs the location to have to be able to guarantee the air circulation, all around is apart from the mask to be supposed to maintain above 1.5M the space.
  • 匿名
2013-05-23 12:26:38
4.1 installation of evaporative condenser venues to ensure that air circulation, around the margin of block should be kept above 1.5M space.
  • 匿名
2013-05-23 12:28:18
4.1 It evaporate condenser installation ground last airiness,all around distance be should last 1.5M to be lasted thinged with at among being empty.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭