当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:水箱筒壁施工采用40号4mm厚等边角和Φ25钢筋制作的轻型钢桁架梁@1.5m、脚手架管@1.2m环向联系、上铺马道板钉防滑木条工作平台。工作平台桁架梁底部与下环板预埋Φ25圆钢焊接,上部采用Φ8钢丝绳与人井筒壁预埋钢筋吊环连接。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
水箱筒壁施工采用40号4mm厚等边角和Φ25钢筋制作的轻型钢桁架梁@1.5m、脚手架管@1.2m环向联系、上铺马道板钉防滑木条工作平台。工作平台桁架梁底部与下环板预埋Φ25圆钢焊接,上部采用Φ8钢丝绳与人井筒壁预埋钢筋吊环连接。
问题补充:

  • 匿名
2013-05-23 12:21:38
Tank tube wall construction using 40 4mm thick steel production such as corners and Φ25 light steel truss girder @ 1.5m, scaffolding tubes @ 1.2m ring to contact nail plate capped with bridleways work non-slip wooden platform. Working platform truss bottom plate with embedded Φ25 round circumferenti
  • 匿名
2013-05-23 12:23:18
Using 40 tanks and wall construction, 4mm thick steel 25 equilateral triangles point and Φ produced the light steel truss Leung @ 1.5 @ 1.2 m m, scaffolding tubes, snugly Ma road links to central GEM nails skid wooden platform for the work. platform for the work with the central truss Leung at the b
  • 匿名
2013-05-23 12:24:58
The water tank tube wall construction uses 40 4mm thick and so on the corners and φ25 steel bar manufacture light section girder truss @1.5m, the scaffold manages the @1.2m link to the relation, the upper berth training ground board nail skid prevention wooden staff working platform.The working plat
  • 匿名
2013-05-23 12:26:38
Tank wall construction with thick angle and φ, 40th 25 bars made of lightweight steel truss beam @1.5M, scaffolding pipes @1.2m ring spread Mr Geoffrey Ma Tao-plate nailed to ties, skid wooden platform. Work platform under the bottom of the truss girder and annular plate embedded φ 25 round steel we
  • 匿名
2013-05-23 12:28:18
Water tank tube wall construct adopt 4mm 25 reinforcing bars of corner and Φ such as being thick make light section steel truss roof beam @ 1.5m 40, it in charge of scaffold by 1.2m on @ it get in touch annularly, at if you can't spread by horse lines of board, last slip resistance stuff workbench.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭