重型设备基座固定应完工,设备安装在基座上,基座高度应同地板上表面完成高度一致;
问题补充:

  • 匿名
2013-05-23 12:21:38
Heavy equipment should be completed in a fixed base, equipment installed in the base, the base height of the floor surface should be done with a high degree of consistency;
  • 匿名
2013-05-23 12:23:18
Heavy Equipment base, fixed should be completed installation of the equipment, the base, pedestal height should be completed with a high degree of consensus on the floor surface;
  • 匿名
2013-05-23 12:24:58
The heavy equipment base fixed should finish, the equipment setup on the base, the base should the surface complete highly consistently highly with the floor on;
  • 匿名
2013-05-23 12:26:38
Fixed heavy equipment base should be completed and installed equipment on the base, base line height should be completed with floor surface height;
  • 匿名
2013-05-23 12:28:18
Heavy-duty apparatus base should complete while being fixed, equipment installation, in base, base height should finish the high unanimity with the above surface of floor;
 
 