当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:目前区内道路宽阔平坦,已建成道路里程40公里,形成“三纵三横”交通网。水、电、弱电、燃气等配套设施完备,投资5000万元的产业集聚区污水处理厂已建成运行,投资2.2亿元的水处理中心正在紧张施工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
目前区内道路宽阔平坦,已建成道路里程40公里,形成“三纵三横”交通网。水、电、弱电、燃气等配套设施完备,投资5000万元的产业集聚区污水处理厂已建成运行,投资2.2亿元的水处理中心正在紧张施工。
问题补充:

  • 匿名
2013-05-23 12:21:38
Currently local roads wide flat, the road mileage of 40 km have been built to form a "three vertical and three horizontal" transportation network. Water, electricity, weak, gas and other supporting facilities, invested 50 million yuan of industrial clustering sewage treatment plant has been built to
  • 匿名
2013-05-23 12:23:18
The current road in the district have been built, broad, flat road mileage 40 km, thus forming a "horizontal" 3 3 vertical transportation network. Water, electricity, and weak electricity, gas, and other ancillary facilities are available in $50 million investment in industrial agglomerations sewage
  • 匿名
2013-05-23 12:24:58
At present in area path broad smooth, has completed the path course 40 kilometers “vertical, the formation three three horizontal” the communications network.The water, the electricity, the weak electricity, the fuel gas and so on the necessary facility is complete, invests 50,000,000 Yuan industrie
  • 匿名
2013-05-23 12:26:38
Wide flat now local roads, has been built 40 kilometers of roads to form a "three longitudinal and three transverse" ancillaries. Water, electricity, light current, gas, and supporting facilities, to invest $ 50 million industry zone sewage treatment plant has been built to run invest 220 million wo
  • 匿名
2013-05-23 12:28:18
The road in the district is wide and smooth at present, have already built up 40 kilometers of course of a road, has formed network of communication lines of " three verticals and three horizontals ". Auxiliary facilities such as water, electricity, weak current, gas,etc. are complete, the sewage tr
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭