当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Next, the site is prepared to receive the building. This work may involve grading the top surface to bring it to the proper elevations, excavating to required depths for basement and foundations, and shifting of utility piping. For deep excavations, earth sides are braced and the bottom is drained.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Next, the site is prepared to receive the building. This work may involve grading the top surface to bring it to the proper elevations, excavating to required depths for basement and foundations, and shifting of utility piping. For deep excavations, earth sides are braced and the bottom is drained.
问题补充:

  • 匿名
2013-05-23 12:21:38
接下来,该网站准备接收的建设。这项工作可能会涉及分级的顶面,把它适当的海拔高度,地下室和基金会需要深度挖掘,公用事业管道转移。深基坑,土双方都支撑和底部排出。
  • 匿名
2013-05-23 12:23:18
下一步,该网站是准备接收的建设。 这项工作可能涉及的等级顶面,使其适当的高地,挖掘深度,需要作地庫、基金会和转移用途的管道。 为深入挖掘,地球是双方腰带和底部的排出。
  • 匿名
2013-05-23 12:24:58
其次,站点准备接受大厦。 这工作也许介入分级顶面给适当的海拔带来它,挖掘到必需的深度为地下室和基础和转移公共管道系统。 为深刻的挖掘,地球边被支撑,并且排泄底部。
  • 匿名
2013-05-23 12:26:38
接下来,该网站准备接收建设。这项工作可能涉及分级顶部曲面,使其适当的海拔,到地下室及基金会、 所需深度挖掘和转移的实用程序管道。深基坑,地球双方支撑,耗尽了底部。
  • 匿名
2013-05-23 12:28:18
null
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭