当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:④参与编制施工进度计划、劳动力和物质设备调配计划,参与施工平面布置图、施工技术交底图的绘制;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
④参与编制施工进度计划、劳动力和物质设备调配计划,参与施工平面布置图、施工技术交底图的绘制;
问题补充:

  • 匿名
2013-05-23 12:21:38
④ involved in the preparation of the construction schedule, labor and material equipment deployment plan, floor plan in construction, construction of technical tests mapping;
  • 匿名
2013-05-23 12:23:18
Participation in the development plan 4 construction progress, labor and material equipment deployment plan involved in construction, floorplanning and construction technology to the bottom mapping;
  • 匿名
2013-05-23 12:24:58
④Participates in the establishment construction progress plan, the labor force and the material equipment mixes the plan, the participation construction floor-plan, the construction technology gives the low-down the chart plan;
  • 匿名
2013-05-23 12:26:38
④ in the preparation of construction progress plan, labor and material equipment allocation plans, participate in the construction of floor plans, preparation of drawings for construction technology gives the low-down;
  • 匿名
2013-05-23 12:28:18
④Participate in working out construction speed plan, workforce and material apparatus to allocate the plan, participate in construct level layout drawing, construct drawing pursued to confide a technological secret;
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭