当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:井点降水同时可以起到土体加固作用。为使施工顺利进行,井点在基坑开挖前2周开始。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
井点降水同时可以起到土体加固作用。为使施工顺利进行,井点在基坑开挖前2周开始。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
Well points can, at the same time precipitation reinforced role played by the Commonwealth. In order for the construction proceeded smoothly, and the foundation pit digging wells point before beginning 2 weeks.
  • 匿名
2013-05-23 12:24:58
At the same time the well point precipitation may play the soil body reinforcement role.In order to cause the construction to carry on smoothly, well point in structure excavation previous 2 weeks starts.
  • 匿名
2013-05-23 12:26:38
Well-point dewatering and may play a role in soil reinforcement. To enable the construction of smooth, well in Foundation pit excavation the first 2 weeks of starting.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭