求翻译:Time delay claims due to the developer had failed to provide construction conditions prescribed by the contract, if not prompt delivery design drawings, technical data, site, road; Or the contractor reason the developer instructions to stop the project implementation; Or other causes of force majueure effect cause for 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Time delay claims due to the developer had failed to provide construction conditions prescribed by the contract, if not prompt delivery design drawings, technical data, site, road; Or the contractor reason the developer instructions to stop the project implementation; Or other causes of force majueure effect cause for
问题补充:

  • 匿名
2013-05-23 12:21:38
null
  • 匿名
2013-05-23 12:23:18
由于索赔的时间延迟,发展商没有向建设条件的合约订明的,如果不及时提供设计图纸、技术数据、地盘、道路;或该承建商原因的指示,停止发展商的项目的执行;或其他原因造成的影响的部队majueure工程中断,或工程进展缓慢下来,使这一时间延迟,承包商的索赔。
  • 匿名
2013-05-23 12:24:58
时延的要求由于开发商未提供合同,如果不及时交付设计图规定的建筑情况,技术数据,站点,路; 或承包商原因开发商指示停止项目实施; 或力量majueure作用起因的其他起因为工程学中断或者工程学进展减速,做这时延,承包商要求。