当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:冬季要在井口设锅炉,采用热水搅拌混凝土。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
冬季要在井口设锅炉,采用热水搅拌混凝土。
问题补充:

  • 匿名
2013-05-23 12:21:38
Winter, the boiler is located in the wellhead, the use of hot water mixing concrete.
  • 匿名
2013-05-23 12:23:18
In winter, using hot water wells located boiler mixing concrete.
  • 匿名
2013-05-23 12:24:58
The winter must suppose the boiler in the well head, uses the hot water agitation concrete.
  • 匿名
2013-05-23 12:26:38
In winter when the mouth is set boiler, using hot water mixing concrete.
  • 匿名
2013-05-23 12:28:18
Winter, the boiler is located in the wellhead, the use of hot water mixing concrete.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭