当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Pipe conveyor located on jetty will be placed on concrete foundations. Lateral walkways will be in concrete. The portions of pipe conveyors raising to the top of tower 00UEF20 shall be complete with lateral steel walkways for inspection and maintenance and closed gallery in the transition points at the start and at the是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Pipe conveyor located on jetty will be placed on concrete foundations. Lateral walkways will be in concrete. The portions of pipe conveyors raising to the top of tower 00UEF20 shall be complete with lateral steel walkways for inspection and maintenance and closed gallery in the transition points at the start and at the
问题补充:

  • 匿名
2013-05-23 12:21:38
输送管道位于码头将被放置在混凝土基础。
  • 匿名
2013-05-23 12:23:18
位于跳船的管子传动机在具体基础将被安置。侧向走道在混凝土。管子传动机的部分上升在塔00UEF20上面的起初将是完全的与检查和维护的侧向钢走道和闭合的画廊在转折点和在管子传动机结束时。
  • 匿名
2013-05-23 12:24:58
位于跳船的管子传动机在具体基础将被安置。 侧向走道在混凝土。 管子传动机的部分上升在塔00UEF20上面的起初将是完全的与侧向钢走道为检查和维护和闭合的画廊在转折点和在管子传动机的末端。
  • 匿名
2013-05-23 12:26:38
圆管式胶带输送机位于码头上将放置在混凝土基础上。外侧人行道将混凝土中。管输送机提高到顶部的塔 00UEF20 的部分应完全与外侧钢人行道上检验和维修和闭合的画廊在开始时和在结束了管道输送机的过渡点。
  • 匿名
2013-05-23 12:28:18
烟斗传送机在码头上定居将被放到具体基础上。侧面的人行道将在混凝土中。到塔 00UEF20 的顶部的烟斗传送机提高的部分为检验和维护将具有侧面钢铁人行道和在过渡中封锁美术馆指着开始和在烟斗传送机之末。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭