当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The assessment team should then determine and document any additional controls that would minimize the risks to a reasonably practicable level, ensuring that no new hazards are introduced. Actions should be prioritized acknowledging recommendations included in the Risk Matrix.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The assessment team should then determine and document any additional controls that would minimize the risks to a reasonably practicable level, ensuring that no new hazards are introduced. Actions should be prioritized acknowledging recommendations included in the Risk Matrix.
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
评估队应该然后确定和提供使风险减到最小对一个合理地可实行的水平的所有另外的控制,保证没有介绍新的危险。行动应该是在风险矩阵包括的给予优先的承认的推荐。
  • 匿名
2013-05-23 12:24:58
评估队应该然后确定和提供使风险减到最小对一个合理地可实行的水平的所有另外的控制,保证没有介绍新的危险。 行动应该是在风险矩阵包括的给予优先的承认的推荐。
  • 匿名
2013-05-23 12:26:38
评估小组然后应确定并记录任何附加的控件,以尽量降低到一个合理地切实可行的范围内的水平,确保没有新的危险都介绍了风险。应该承认风险矩阵中所列建议优先行动。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭