当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:At present, the loop around the city, 77 kilometers in length, which includes the existing commuter road by reconstruction, the new freeway. After the completion of the highway according to the SNIP RK 3.03-09-2006 demand will have a category 1b and 11 the length of the reconstruction of the new yu-43 km, construction-是什么意思?

待解决 悬赏分:1 - 离问题结束还有
At present, the loop around the city, 77 kilometers in length, which includes the existing commuter road by reconstruction, the new freeway. After the completion of the highway according to the SNIP RK 3.03-09-2006 demand will have a category 1b and 11 the length of the reconstruction of the new yu-43 km, construction-
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
当前,在城市附近的圈,长度77公里,由重建包括现有的通勤者路,新的高速公路。在高速公路的完成根据剪RK 3.03-09-2006需求的将有一个类别1b和11后新的Yu43 km,包括新建工程的建筑34 km的重建的长度,是路的零件,横渡额尔齐斯河的长度17 km。
  • 匿名
2013-05-23 12:24:58
当前,圈在城市附近, 77公里长,由重建包括现有的通勤者路,新的高速公路。 在高速公路的完成根据剪RK 3.03-09-2006需求将有一个类别1b和11之后新的yu-43公里,建筑34公里的重建的长度,包括新建工程是路的零件,横渡Ertix河的长度17公里。 这个网站用现有的路 (离开) 和Pavlodar Akesu Cun, Om J Kerbaj P Lo Dahl maikapshagai (权利)。 二个水平交换在一个另外的地方对现有的路的一个新的零件,在ouse RMB PYA戈尔丝绸和设计“kazdorproekt”运输互换左; 为设计“kazniipi”汇兑银行dortran
  • 匿名
2013-05-23 12:26:38
目前,各地市 77 公里的长度,其中包括现有的通勤公路重建,新的高速公路的循环。根据截图 RK 3.03-09-2006年需求公路完成将类别 1b 和 11 新宇 43 公里的长度后,施工 34 公里,包括新建设是重建的路,十字架的额尔齐斯河 17 公里长度的一部分。现有的道路 (左) 和巴甫洛达尔阿克苏村、 Om J Kerbaj P 罗湖达尔 maikapshagai (右) 与此 web 站点。在附加到现有的公路,在乌斯人民币 PYA 戈尔丝绸新部分地方两个层面的交流和设计 «kazdorproekt» 运输交汇处左;对于那些设计 «kazniipi» 外汇银行 dortrans。车站路
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭