求翻译:After the ditch has been back filled above the surrounding ground, a side boom or dozer tread shall be used to compact the backfill. This tamping action is not to be done on terrain where drainage tile exists. After the tamping operation is completed the remaining backfill shall be spread over the pipelines to the sati是什么意思?

待解决 悬赏分:1 - 离问题结束还有
After the ditch has been back filled above the surrounding ground, a side boom or dozer tread shall be used to compact the backfill. This tamping action is not to be done on terrain where drainage tile exists. After the tamping operation is completed the remaining backfill shall be spread over the pipelines to the sati
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
在垄沟在周围的地面上后被填装了,旁边景气或打瞌睡的人踩将用于变紧密重新填没。这次填塞行动不将做在排水设备瓦片存在的地形。在填塞操作完成保持后重新填没将被延长管道使所有者确信。
  • 匿名
2013-05-23 12:24:58
在垄沟在周围的地面之上之后被填装了,旁边景气或dozer踩将用于变紧密重新填没。 这次填塞行动不将做在地形,排水设备瓦片存在。 在填塞操作完成残余之后重新填没将被延长管道到所有者的满意。
  • 匿名
2013-05-23 12:26:38
沟里回来填周围地面后,侧臂或推土机胎面不得用于紧凑,回填。这个强夯的行动并不是在地形排水瓷砖存在的地方做。强夯操作完成后,剩余的回填应遍布管道向业主的满意度。
  • 匿名
2013-05-23 12:28:18
在水沟之后回来了在周围的地上充满,边繁荣或打瞌睡的人沿着走将用于压缩覆土。这次填塞行动是不在排水瓦片存在的地形上完成。填塞操作完成后剩余覆土将被穿越管道到业主的满意。
 
 