当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Our model closely captures the Dreamliner project at Boeing. In our model, Boeing’s suppliers form the set M of “manufacturers,” and a single small company represents P. In our model, completin times—not cost—are the objective. Indeed, consider the business environment in 2004 following the economic downturn. Overcapac是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Our model closely captures the Dreamliner project at Boeing. In our model, Boeing’s suppliers form the set M of “manufacturers,” and a single small company represents P. In our model, completin times—not cost—are the objective. Indeed, consider the business environment in 2004 following the economic downturn. Overcapac
问题补充:

  • 匿名
2013-05-23 12:21:38
我们的模型紧密地抓住梦想飞机项目在波音公司。在我们的模型中,波音公司的供应商组成的集合M“制造商”和一个小公司表示对。在我们的模型中,completin倍 - 而不是成本是客观的。的确,考虑到经营环境在2004年之后的经济衰退。谁精简迅速,均小于急于进行资本投资的滞后economy.according由韦恩(2007)在华尔街日报发表了一篇文章,梦想飞机的波音公司交付延迟产能过剩困扰公司随后三个月的延误飞机的飞行测试计划,由合共持有飞机的机身,机翼和尾翼部分紧固件的全球性短缺所造成的部分。这是指示该时间是首要关心的问题,而第三方容量是有限的,类似于我们的模型。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
我们的模型严密夺取Dreamliner项目在波音。 在我们的模型,波音的供应商形成集合M “制造商”,并且一家唯一小公司代表P。 在我们的模型, completin时间没有费用是宗旨。 的确,考虑商业环境在跟随经济不景气的2004。 超负荷困扰了在绝热材料经济比热切迅速减小并且是做资本投资的公司。根据文章由韦恩2007年 (,) Dreamliner的波音的交付延迟在华尔街日报在飞机的飞行测试节目出版了跟随了3个月的延迟,造成一部分由相连飞机的机体、翼和尾部紧固件的全世界短缺。 这是表示的时间是首要的关注,并且第三方容量是缺乏的,相似于我们的模型。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭