当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Step 5. Then, the appropriate actions to achieve the levels planned for performance are identified. The measures can range from the demand levelling to the improvement of forecasting techniques applied, from the reducing of lead times to the re-sizing of the input and output batches. Notice that, while considering and 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Step 5. Then, the appropriate actions to achieve the levels planned for performance are identified. The measures can range from the demand levelling to the improvement of forecasting techniques applied, from the reducing of lead times to the re-sizing of the input and output batches. Notice that, while considering and
问题补充:

  • 匿名
2013-05-23 12:21:38
步骤5。然后,适当的行动,以实现计划的绩效水平确定。该措施的范围可以从需求找平的应用预测技术的提高,从铅倍减少到输入和输出批次的重新调整大小。请注意,在考虑和重新定义这个类型的参数或指标,该模拟分析仍然在操作层面。有关调查SKU的物流行为(实际的或计划)的战略问题,必须考虑进来,在目标设定的定性判断相。
  • 匿名
2013-05-23 12:23:18
第5.步。然后,达到水平的适当行为计划对表现被辨认。措施可能从成水平的需求范围到预报技术的改善从减少运用的,前置时间到重量尺寸输入和输出批。当考虑和重新解释此参量或显示的类型,模拟分析保持在操作水平时,注意。
  • 匿名
2013-05-23 12:24:58
第5步。 然后,达到水平的适当行为计划对表现被辨认。 措施可能从需求范围成水平到预报技术的改善从减少申请的,前置时间到重量尺寸输入和输出批。 当考虑和重新解释此参量或显示的类型, simulative分析保持在操作水平时,注意。 必须析因在定性 (评断阶段) 宗旨设置期间,战略问题关于逻辑斯谛的行为实际或计划被调查的SKU。
  • 匿名
2013-05-23 12:26:38
第 5 步。然后,确定适当的行动,实现计划的性能级别。各项措施的范围可以从平整的预测技术的应用,从减少铅时代对重新调整大小的输入和输出的批次的改善的需求。请注意,同时考虑到并重新定义此类型的参数或指标,仍然模拟分析是在操作层面上。有关的调查 SKU、 物流行为 (实际或计划) 的战略问题必须考虑,在设置目标的定性判断阶段。
  • 匿名
2013-05-23 12:28:18
步骤 5。然后,实现被其作计划的水平的适当的行动表现被标识。手段可以介于从到输入和产品一批的重新依大小排列的前置时间的减少变平到预测被应用的技术的改进的需求。通知那,当考虑和重新定义这时参数或指标的输入,模拟的分析在运算水平剩余。关于被调查的 SKU 的后勤 ( 实际或者计划 ) 行为的战略性问题,必须被算进,在落下的目标的性质上的裁决阶段期间。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭