当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Step 4. After the parameters have been identified, the distance between the present and the future state is evaluated and analyzed. This could lead to an Inventory sizing problem. Therefore, because the IOC model employs the average amount of items stocked, the simulation may result in a reduction or an increase of the是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Step 4. After the parameters have been identified, the distance between the present and the future state is evaluated and analyzed. This could lead to an Inventory sizing problem. Therefore, because the IOC model employs the average amount of items stocked, the simulation may result in a reduction or an increase of the
问题补充:

  • 匿名
2013-05-23 12:21:38
步骤4。参数已经确定之后,现在和未来状态之间的距离进行评估和分析。这可能导致一个清单的大小问题。因此,由于国际奥委会模型采用放养项目的平均金额,模拟可能导致减少或增加选定SKU目前备货充足数量的,按上演出的目标。
  • 匿名
2013-05-23 12:23:18
第4.步。在参量被辨认了后,当前和未来国家之间的距离被评估并且被分析。这能导致存货涂料问题。所以,因为IOC模型使用被库存的平均相当数量项目,模仿也许导致减少或潮流被库存的数量的增量选择的SKU的,根据在表现的宗旨。
  • 匿名
2013-05-23 12:24:58
第4步。 在参量被辨认了之后,当前和未来状态之间的距离被评估并且被分析。 这能导致存货涂料问题。 所以,因为IOC模型使用被库存的平均相当数量项目,模仿在表现也许导致减少或当前被库存的数量的增量为选择的SKU,根据宗旨。
  • 匿名
2013-05-23 12:26:38
第 4 步。已确定参数后,目前和未来的国家之间的距离是进行评估和分析。这可能导致库存调整大小问题。因此,因为国际奥委会模型采用了项目投放的平均量,模拟可能会导致减少或当前库存数量的增加为选定的 SKU,根据对目标的性能。
  • 匿名
2013-05-23 12:28:18
步骤 4。参数被标识了后,礼物和将来州之间的距离被评价和分析。这可以导致依大小排列问题的一批库存。因此,因为 IOC 模型使用被储备的条款的平均数量,模拟愿为了指定的 SKU 导致一次缩减或当前被储备的数量的增长,根据有关演出的目标。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭