当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:从地铁盾构自身施工参数优化和监控量测分析2个方面提出地铁盾构施工引起地表变形的控制技术措施。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
从地铁盾构自身施工参数优化和监控量测分析2个方面提出地铁盾构施工引起地表变形的控制技术措施。
问题补充:

  • 匿名
2013-05-23 12:21:38
To shield itself from the subway construction parameter optimization and the monitoring measurement analysis of two proposed control technique measures surface deformation caused by Subway Construction.
  • 匿名
2013-05-23 12:23:18
Build your own from the subway shield construction parameter optimization and monitoring a measured analysis of 2 MTR shield surface deformation structure arising from construction of the control measures.
  • 匿名
2013-05-23 12:24:58
Analyzes 2 aspects from the subway shield own construction parameter optimization and the monitoring gauging to propose the subway shield construction causes the control technology measure which the surface distorts.
  • 匿名
2013-05-23 12:26:38
From the subway construction of shield's own monitoring and measuring of parameters optimization and analysis of Metro 2 aspects of ground deformation induced by shield construction control technical measures.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭