当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:第三步:待地面完全干燥后,土建在地面做双层SBS防潮,防潮层上翻到屏蔽墙面30cm.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
第三步:待地面完全干燥后,土建在地面做双层SBS防潮,防潮层上翻到屏蔽墙面30cm.
问题补充:

  • 匿名
2013-05-23 12:21:38
The third step: when the ground is completely dry, construction on the ground to do the double sbs moisture-proof, moisture-proof layer on the turn to shield wall 30cm.
  • 匿名
2013-05-23 12:23:18
Step 3: to be surface dry completely, and build on the ground doing double SBS moisture, moisture level up to the Shield Wall 30 cm .
  • 匿名
2013-05-23 12:24:58
Third step: After waits the ground to be completely dry, the construction makes double-decked SBS in the ground to be moisture-proof, the dampproof course upturns to shield wall surface 30cm.
  • 匿名
2013-05-23 12:26:38
Third step: to the ground to dry completely, construction on the ground doing double SBS moisture-proof, moisture-proof layer to shield the walls 30cm.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭