求翻译:由于隧道进出口边坡仰坡主要由碎石土层构成,洞口及明洞开挖后,及时进行边、仰坡加固处理,确保边坡稳定,沿坡面施作砂浆锚杆,挂钢筋网喷射混凝土进行加固;边、仰坡采用锚、网、喷防护,锚杆采用梅花形布设,最后喷射C20混凝土封闭。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
由于隧道进出口边坡仰坡主要由碎石土层构成,洞口及明洞开挖后,及时进行边、仰坡加固处理,确保边坡稳定,沿坡面施作砂浆锚杆,挂钢筋网喷射混凝土进行加固;边、仰坡采用锚、网、喷防护,锚杆采用梅花形布设,最后喷射C20混凝土封闭。
问题补充:

  • 匿名
2013-05-23 12:21:38
As the tunnel slope Yang Import & Export mainly by gravel slope soil composition, and Myeong-hole after excavation, in a timely manner while, Yang slope reinforcement, to ensure slope stability, slope facilities for the mortar along the bolt, hanging steel net injection concrete reinforcement; s
  • 匿名
2013-05-23 12:23:18
As the tunnel import and export side slope upward slope, mainly by gravel layer constitutes a hole after excavation and Myeong-dong, Songpa-gu, and lift up timely to side with reinforcement to ensure stability of a slope, on the slope surface for mortar shank, hanging Rebar Web shotcrete reinforceme
  • 匿名
2013-05-23 12:24:58
Because the tunnel import and export side slope supine slope mainly by the crushed stone soil layer constitution, after Dongkou and clearly opens wide digs side, promptly carries on, supine slope reinforcement processing, guarantees the stability of slope, executes along the slope face makes the mor
  • 匿名
2013-05-23 12:26:38
Due to import and export primarily made up of gravel soil on the slope upward slope of the tunnel, the entrance and after excavation of Myeongdong, edges, inverted slope reinforcement in a timely manner to ensure slope stability along the slope effect of mortar bolt, hang steel fabric shotcrete rein
  • 匿名
2013-05-23 12:28:18
As the tunnel slope Yang Import & Export mainly by gravel slope soil composition, and Myeong-hole after excavation, in a timely manner while, Yang slope reinforcement, to ensure slope stability, slope facilities for the mortar along the bolt, hanging steel net injection concrete reinforcement; s
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭