当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:靠近桥台部位的梁段砼,一般采用支架现浇或采用在墩台旁设临时支柱,安装吊篮并进行浇注。当这一部分较短时,也可用吊架浇筑。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
靠近桥台部位的梁段砼,一般采用支架现浇或采用在墩台旁设临时支柱,安装吊篮并进行浇注。当这一部分较短时,也可用吊架浇筑。
问题补充:

  • 匿名
2013-05-23 12:21:38
Parts of the beam near the abutment concrete segments, commonly used stents in-situ or used in temporary piers next to the pillar, and the installation of the basket casting. When this part is short, the hanger can also be poured.
  • 匿名
2013-05-23 12:23:18
Close to 2,700,000 parts of paragraph Leung promises, generally using stent superstructure or applied to the adjacent platform, install temporary pillars basket and pouring. When this part hanger is shorter, and can also be used when pouring.
  • 匿名
2013-05-23 12:24:58
The nearness abutment spot Liang section tong, uses the support cast-in-place generally or uses nearby pillar Taiwan supposes the prop, installs the hanging basket and carries on the casting.When this part short-time, also available hanging bracket construction.
  • 匿名
2013-05-23 12:26:38
Near the bridge abutment concrete mixed with parts of the beam section, generally use the scaffold in-situ or using temporary pillars near the pier, install basket and casting. When this part of the shorter, also available hangers pouring.
  • 匿名
2013-05-23 12:28:18
Parts of the beam near the abutment concrete segments, commonly used stents in-situ or used in temporary piers next to the pillar, and the installation of the basket casting. When this part is short, the hanger can also be poured.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭