求翻译:施工准备、清理场地(清淤)→测量放样、动力探触→确定路基填筑的宽度、填前压实→监理工程师复测→自卸汽车上填料→空压机打孔放解炮→推土机整平 压路机碾压→标高、压实度、宽度、 边坡等自检→监理工程师验收→上一层填筑。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
施工准备、清理场地(清淤)→测量放样、动力探触→确定路基填筑的宽度、填前压实→监理工程师复测→自卸汽车上填料→空压机打孔放解炮→推土机整平 压路机碾压→标高、压实度、宽度、 边坡等自检→监理工程师验收→上一层填筑。
问题补充:

  • 匿名
2013-05-23 12:21:38
Construction preparation, site clearance (dredging) → survey and setting out, touch the power probe → determine the width of roadbed construction, compacted fill before the supervising engineer retest → → → Compressors dump truck on the filler gun → bulldozer punch up the solution → leveling roller
  • 匿名
2013-05-23 12:23:18
[object Object]
  • 匿名
2013-05-23 12:24:58
Front the construction preparation, cleans up the location (clear silt) -> the survey lofting, the power searches touches -> the determination roadbed reclamation width, fills in the compaction -> to oversee engineer on the repetition measurement -> dump truck the padding -> air compr
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
Construction preparation, site clearance (dredging) → survey and setting out, touch the power probe → determine the width of roadbed construction, compacted fill before the supervising engineer retest → → → Compressors dump truck on the filler gun → bulldozer punch up the solution → leveling roller
 
 