当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:填石路堤填筑前必须先用大块石码好边坡,再开始填筑。填筑时,应将石块大面向下,摆放平稳,紧密靠拢,缝隙均以小石块和石屑满,然后再碾压。如有石料粒径过大的则要用小空压机放炮解小,才可进行施工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
填石路堤填筑前必须先用大块石码好边坡,再开始填筑。填筑时,应将石块大面向下,摆放平稳,紧密靠拢,缝隙均以小石块和石屑满,然后再碾压。如有石料粒径过大的则要用小空压机放炮解小,才可进行施工。
问题补充:

  • 匿名
2013-05-23 12:21:38
Rock fill embankment before the code must be good with a large rock slope, then start filling. Filling, should face down large stones, placed in a smooth, tightly close, small gaps are filled with stones and stone chips, and then rolled. If the stone size is too large the solution is to use a small
  • 匿名
2013-05-23 12:23:18
Reclaimed stone embankment reclamation must be used first before chunks good side slope, stone yards longer start reclaimed. Reclamation will be throwing stones at Omo downward, should be placed in a smooth and seamless are closely aligned with small stones and gravel, and then crushing expires. If
  • 匿名
2013-05-23 12:24:58
In front of the rock fill embankment reclamation must use the big rubble stone code good side slope first, then starts the reclamation.When reclamation, should the stone face under, the place be greatly steady, close stem for stem, slit by small stone and Shi Xieman, then again roller compaction.If
  • 匿名
2013-05-23 12:26:38
Before the rock-filled embankment slope must be first with Boulder codes, and start filling. When the filling should be under the rock-oriented, placed a smooth, close close up, gaps are small stones and stone chip and then rolled. If aggregate particle size is too large to small air compressor firi
  • 匿名
2013-05-23 12:28:18
Rock fill embankment before the code must be good with a large rock slope, then start filling. Filling, should face down large stones, placed in a smooth, tightly close, small gaps are filled with stones and stone chips, and then rolled. If the stone size is too large the solution is to use a small
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭