当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:运行一个月后,发现漏水,经停水检查,发现是闸板阀的蝶形密封条被闸板闸断,一共有两台是什么意思?

待解决 悬赏分:1 - 离问题结束还有
运行一个月后,发现漏水,经停水检查,发现是闸板阀的蝶形密封条被闸板闸断,一共有两台
问题补充:

  • 匿名
2013-05-23 12:21:38
Running a month later, found leaking, without water check, gate valve, butterfly seal gate gate off, a total of two
  • 匿名
2013-05-23 12:23:18
After running a month, find a water leak, the water was found to be the flap valve of the butterfly-shaped seal off the Flap gates, with a total of two
  • 匿名
2013-05-23 12:24:58
Moves for a month, discovers the water leakage, after cuts off the water supply the inspection, the discovery is the gate valve butterfly-shaped packing by the damper plate locking, altogether some two
  • 匿名
2013-05-23 12:26:38
Run a month later, find leaks, inspected by the water, found to be the gate valve, butterfly-shaped seal gate gate broken, a total of two
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭