求翻译:基础施工时必须采取有效措施人工降低地下水位,待地下室回填(且主体结构封顶)完成后方可停止降水。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
基础施工时必须采取有效措施人工降低地下水位,待地下室回填(且主体结构封顶)完成后方可停止降水。
问题补充:

  • 匿名
2013-05-23 12:21:38
Foundation construction must take effective measures to artificially lower the groundwater levels, until the basement backfill (and the main structure of the cap) to complete stop before precipitation.
  • 匿名
2013-05-23 12:23:18
Construction of basis must be taken when manually effective measures to lower the groundwater levels, basement backing (and body structure capping) to stop after precipitation.
  • 匿名
2013-05-23 12:24:58
When foundation construction must adopt the effective action artificial ground water lowering, after treats the basement backfill (also main body structure places an upper limit on) completes only then stops the precipitation.
  • 匿名
2013-05-23 12:26:38
Foundation construction of artificial lowering of ground water level must take effective measures, pending backfill in the basement (and main structure capped) completed before the cessation of precipitation.
  • 匿名
2013-05-23 12:28:18