当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:沉桩施工前应清理场地及地下障碍物,了解周边建筑物及地下管线情况,并制定合理的沉桩施工组织设计。需采取有效措施防止挤土对周边建筑产生不利影响。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
沉桩施工前应清理场地及地下障碍物,了解周边建筑物及地下管线情况,并制定合理的沉桩施工组织设计。需采取有效措施防止挤土对周边建筑产生不利影响。
问题补充:

  • 匿名
2013-05-23 12:21:38
Piling Construction should clear the area and underground obstacles to understand the situation of surrounding buildings and underground pipelines, and the development of rational design of pile construction organizations. To take effective measures to prevent soil compaction adversely affect the su
  • 匿名
2013-05-23 12:23:18
piles should be sunk before the construction site clean up and underground obstructions surrounding buildings, and underground pipeline, and development of rational reflection pile construction organizations in the design. You need to take effective measures to prevent congestion on the surrounding
  • 匿名
2013-05-23 12:24:58
Before the penetration of pile construction should clean up the location and the underground obstacle, understood the peripheral building and the underground utilities situation, and formulates the reasonable penetration of pile construction organization plan.Must take the effective action to preven
  • 匿名
2013-05-23 12:26:38
Piling before construction should clear the area and underground obstacle, understanding of the surrounding buildings and underground pipelines, and develop reasonable pile-sinking construction organization design. Required to take effective measures to prevent the adverse effects of soil compaction
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭