当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:当桩按规定要求沉桩完毕后,若有露出地面的桩段必须在移机前截去。截桩应用锯桩机截割(抗拔桩预应力钢筋不得截断并锚入承台内长度不小于 laE)。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
当桩按规定要求沉桩完毕后,若有露出地面的桩段必须在移机前截去。截桩应用锯桩机截割(抗拔桩预应力钢筋不得截断并锚入承台内长度不小于 laE)。
问题补充:

  • 匿名
2013-05-23 12:21:38
When the pile pile is completed according to requirements, if exposed to ground the pile segment must be amputated before the transfer machine. Pile driver cut pile applications saw cutting (uplift pile prestressed reinforcement shall not be truncated and anchored into the pile cap length is not les
  • 匿名
2013-05-23 12:23:18
When piles piles according to their requirements, if there is a pile of exposed soil must be removed before the cut off. cut pile application saw cut-pile (anti-pull prestressed concrete piles should not be truncated and anchor into the inside length is not less than laE).
  • 匿名
2013-05-23 12:24:58
After the pile finished according to the stipulation request penetration of pile, if has reveals the ground the pile section to have in moves machine front clips.The truncation pile should saw pile machine cutting (anti-pile pulling prestressed rinforcement not have to interrupt and anchor enters re
  • 匿名
2013-05-23 12:26:38
When the pile sinking on completion of requirements, if exposed piles must be truncated before moving machines. Cut pile pile sawing machine cutting (uplift pile bearing platform of prestressed reinforcement shall not be truncated and anchored in length not less than in laE).
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭