求翻译:施工单位沉桩前应熟悉地质勘察报告,掌握场地的工程地质情况,并进行试沉桩,以确定合适的施工机具及配置。沉桩过程中如遇异常情况,或地层与地质勘察报告不符时,应及时与业主、总包单位、设计单位、勘察单位、监理单位联系,共同商讨处理。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
施工单位沉桩前应熟悉地质勘察报告,掌握场地的工程地质情况,并进行试沉桩,以确定合适的施工机具及配置。沉桩过程中如遇异常情况,或地层与地质勘察报告不符时,应及时与业主、总包单位、设计单位、勘察单位、监理单位联系,共同商讨处理。
问题补充:

  • 匿名
2013-05-23 12:21:38
Pile, the construction unit should be familiar with the geological survey reports, master of engineering geological conditions of the site, and the test pile to determine the appropriate construction equipment and configuration. The pile driving process in case of unusual circumstances, or does not
  • 匿名
2013-05-23 12:23:18
piles sunk before construction units should be familiar with geological survey report of the geological disposal sites, and test their piles, to determine the appropriate construction equipment and configuration. In sunken piles in the event of an exception, or formation does not match the geologica
  • 匿名
2013-05-23 12:24:58
In front of the construction penetration of pile should be familiar with the geological prospecting report, grasps the location the engineering geology situation, and carries on tries the penetration of pile, by determines the appropriate construction machines and tools and the disposition.In when p
  • 匿名
2013-05-23 12:26:38
Pile driving construction units should be familiar with before geology investigation report, mastering the engineering geological condition of the venue, and test piling, construction machinery and to determine appropriate configuration. Pile in the process in case of exception conditions, or strati
  • 匿名
2013-05-23 12:28:18