求翻译:施工单位施工申请表:如施工单位要进入接管区域施工前,应向酒店工程部、筹建处提交施工申请表, 筹建处应指定专人审批并盖章方可视为有效;施工单位在获得批准后,向酒店工程部递交申请表,由酒店工程部知会保安部进入许可。申请表应提前12小时呈递,因延误造成不能进入施工由施工单位自行负责。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
施工单位施工申请表:如施工单位要进入接管区域施工前,应向酒店工程部、筹建处提交施工申请表, 筹建处应指定专人审批并盖章方可视为有效;施工单位在获得批准后,向酒店工程部递交申请表,由酒店工程部知会保安部进入许可。申请表应提前12小时呈递,因延误造成不能进入施工由施工单位自行负责。
问题补充:

  • 匿名
2013-05-23 12:21:38
Construction unit application form: such as the construction unit to enter to take over the regional construction, should the hotel engineering department, construction office submitted a construction application form, the Preparation Office shall designate someone for approval and stamped to be reg
  • 匿名
2013-05-23 12:23:18
Application Form: construction works such as construction units to take over the area before the construction, the hotel works, construction, application form, the preparation to the works department should be designated and approved under seal can be seen as effective; construction units after appr
  • 匿名
2013-05-23 12:24:58
Construction construction request form: If the construction wants before the inlet connection region construction, should to the hotel engineering dept, the construction place submission construction request form,%
  • 匿名
2013-05-23 12:26:38
Construction construction application forms: as construction units to enter the take over the area before construction, shall submit to the hotel project, the Planning Department of the Ministry of construction application forms should specify specially assigned for the construction approval and sea
  • 匿名
2013-05-23 12:28:18
 
 